This photovoltaic system has been installed since the end of June 2023. It is not yet connected to the grid, because the grid operator DEDDIE is behind schedule with the delivery of the electricity meter. As soon as everything is working, it will cover the electricity on the ground floor. As a side effect, the panels help to shade the south façade.
A second system is planned for the upper floor, which will be mounted on the roof. The environmentally friendly hot water is already produced thermally by means of a solar collector. The night-time electricity demand is covered by the subscribed wind power.