Renovations terminated

VonUrs

Renovations terminated

Update of 16.11.2022: The exterior structure of the house was in poor condition. Therefore, in May, all load-bearing elements were peeled off, the reinforcing irons were protected and covered with a special cement. In addition, the façades to the north and east were insulated over their entire surface. Finally, the whole house was repainted. The main test soon followed: the house survived the heavy rain of 15/16 October without any damage. And now in November, the indoor climate is much more balanced than a year ago – very comfortable!

The house in its pleasant look after the full renovation.

Update of 26.02.2022: Apartment #3 now has a new kitchen and is painted. Just a few details need to be finished. It can soon be rented. In addition, the entry-gate is renovated now – a true eye-catcher.
Unfortunately, there was water damage in flat #1, after the intense rainfall of the last few days. We found the location where the water infiltrates and sealed it. The living room wall has to be repainted again. I expect that Apt. #1 will be in top shape and ready to rent out in the second part of April.

Among others, following renovations and upgrades have been realized by mid-september 2021:

  • Updated electricity equipment with new safety-elements
  • New automatic light at the entries
  • Insulation of the roof for better room climate upstairs in summer and winter
  • New garden-house for storage of the garden-furniture
  • New kitchen-worktop and shelves in studio #4
  • New closets in studios #1+2
  • A/C machines cleaned and repaired
  • Key-safe boxes for independant access to each studio
  • New steam-extrator pipes in studios #1+2
  • Wall-painting in studios #2+4

Additional works realized from october to december 2021:

  • Wall-painting in studios #1+3
  • New solar collector with electrical support for the boiler
  • New wood stove in Studio #1 (our common room in winter)
  • Small full-wooden boxes in the bathrooms to store things
  • Sun-protection sheds on the south-side balconies
  • Wind-protecting transparent sheds for all balconies
  • Wooden construction as weather protection for the entrances to studios #1+2
  • New double bed for Studio #1
  • For all beds mattress toppers with camel hair filling
  • Renovation of the walls outside

To be finished in January 2022:

  • New kitchen for studio #3
  • Bistro tables and new chairs for indoors and outdoors

Über den Autor

Urs administrator